Rail Yard Stakeout
CP Rail Bluff
Point,
Plattsburgh , New York |
|
Laberge
Group performed construction stakeout for a new rail yard
for CP Rail comprised of two main lines and five side rail
lines. The stakeout began with clearing the site, installing
new culverts, perforated pipe and grading to dry out and
stabilize the soils at the rail yard. After the rails and
ties were delivered, Laberge Group completed stakeout of
new switches, curves and points of frog for over 3,400 linear
feet of new rails and an 800 foot long access road from
Route 9, Plattsburgh, New York.